Determining the depth of storm drainage


24.02.2021

Sewerage

Editorial staff of the “New Place” website

Share

From this article you will learn

:

  1. Regulatory framework for storm drainage
  2. SP requirements for storm sewer slope
  3. Calculation of storm sewer slope
  4. Storm sewer installation
  5. Consequences of incorrect calculation and installation of storm sewer systems
  6. Professional calculation of slope and other storm drain parameters

The slope of a storm drain is one of the key parameters, the incorrect calculation of which paralyzes the operation of the entire system and can lead to a local disaster if a large amount of precipitation falls. We are not just talking about excess water, but about the risk of flooding the site, damaging the foundation of a house or the foundations of other buildings, which will most likely result in their deformation and destruction.

Despite the fact that there is no strict requirement to comply with the standards, it would still be more correct to follow the recommendations given in the regulations. In our article we will tell you what the slope of the storm drain should be, how to calculate it, and also analyze the correct installation of this sewer system and what problems may arise if you make a mistake.

Norms

Inside the apartment there is practically no way to measure the fluid flows in the sewer system using your own capabilities.
Professionals advise to be sure to take into account the permissible numbers indicated in the regulatory tables. According to SNiP recommendations, the flow speed should be 0.7-1 m/sec. For such a speed, the standard angle of inclination should be for products with a diameter of:

  • 5 cm – 30 mm per linear meter;
  • 11 cm – 20 mm per linear meter;
  • 16 cm – 8 mm per linear meter;
  • 20 cm – 7 mm per linear meter.

The regulatory documents that specify these rules are:

  • Clause 18 SNiP 2.04.01/85. The structure of internal drainage and sewage systems for buildings is described in detail here. For example, from here you can find out that drainage branches with a cross-section of 4-5 cm should be laid with a slope of 0.03, and with a cross-section of 8.5-10 cm - 0.02.
  • Clause 2.41 of SNiP 2.04.03/85 on external sewage drains describes the rules regarding the minimum slope of pipes measuring 15 cm. It should be equal to 0.008 cm, and for pipes measuring 20 cm - 0.007 cm.
  • If there is a need to make the network slope smaller, you can be guided by clause 18.2 of SNiP 2.04.01-85. This point takes into account the peculiarities of liquid flow through pipes with different physical characteristics. For example, for plastic pipes the speed coefficient should be 0.5, and for networks made of other materials the coefficient should be 0.6.

A separate explanation in SNiP 2.04.03/85 concerns external sewers with pipe sizes of 15-20 cm. In particular, the rules allow the use of standard indicators for slopes: 0.005 for 20 cm products, 0.007 for 15 cm products.

Clause 18 of SNiP 2.04.01/85 regulates the maximum slope of networks, which should not be more than 0.15. At the same time, branches from plumbing fixtures, the length of which is up to 150 cm, are excluded from the calculations. Thus, on each meter of the sewerage system no more than 15 cm of slope is allowed. If the indicator is exceeded, the highway will silt.

Special tables can help with calculations.

Plumbing device Diameter, cm Slope per meter, cmGap between central drain and siphon, m
bathroom 0,4 3 1-1.3
bath, shower, washing machine 0,5 4.8 1.7-2.3
shower room 0,4 4.8 1.5-1.7

toilet 10 2 Until 6
bidet 0,3, 0,4 2 0.7-1
washing 0,3, 0,4 3.6 1.3-1.5
sink 0,4 1.2 0-0.8
main riser 10
branches from the riser 6,5-7,5

In the mathematical system, angles are measured in degrees, so the numbers given in tables often become unclear. And the numbers mean the fractional ratio of the height of the slope to the length of the drainage system. It will be easier to track the value if you convert the numbers to centimeters. For example, 3 cm by 1 meter, 0.8 cm by 1 meter. If the length of the entire sewer is known, you can multiply it by the slope, which will give the total height for the entire designed sewer.

How to choose the angle of inclination?

In the process of laying sewer systems, when considering the issue of sloping pipes, craftsmen resort to the correct methods for installing a slope; let’s look at what should not be done :

  1. Make a slope based on considerations of the formation of an acute angle of inclination. On the one hand, this method is convenient because the water will reach its destination faster. On the other hand, the operation of the pipe will be significantly reduced. Particles of debris, dirt or other impurities may remain in the pipe during rapid drainage, causing it to become clogged. In addition, fecal fractions will not be able to leave the pipe. Too large an angle or counter-slope will especially negatively affect the operation of the sewer system. Thus, this method is not entirely correct, since it is worth taking into account the minimum and maximum angle values. This is written in the regulatory documentation (see below).
  2. Arrange a minimal slope or do not take this point into account at all when installing sewer drains. The method is absolutely wrong, since ignoring the slope device will lead to stagnation of water.

Carry out the slope based on the requirements of standards and specialized literature. The surest way to follow.

Why calculate the slope?

By organizing the sewer slope, you can avoid:

Stagnation of water . A fairly common problem for everyone who has a sewer system.

Siltation . If this happens, then very soon the air siphons (check valves) will become unusable and there will be an unpleasant smell around. If a similar problem occurs on the walls of the main pipeline, the entire sewer system will break down.

Pipeline breaks.

Thanks to optimal fluid flow, no unwanted accumulation will occur. It will also be possible to get rid of corrosion on the surface of structures.

Previously, when installing sewer systems in apartment buildings, the slope of the sewer pipe by 1 meter was not calculated, and often it was not satisfied. This led to constant system breakdowns and regular repair work.

Providing a slope is required not only in urban apartment conditions. Recently, sewage systems have been installed in private homes and even bathhouses. Instead of ordinary cesspools, special wells (septic tanks) began to be used to receive wastewater.

Features of the depth of storm drainage according to SNiP

The regulatory document does not provide precise instructions on the depth of pipes. But there are some recommendations. When choosing depth, several important factors are taken into account

They take into account the depth of soil freezing, the occurrence of water, and the personal experience of the specialist.

Recommendations for choosing the depth of storm drains:

  • If the dimensions of the pipes are less than 500 mm, then they should be laid 30 cm below the soil freezing level;
  • If the diameter exceeds 500 mm, this figure is 50 cm.

The thickness of the sand cushion should be added to the burial depth. This is the indicator that is considered optimal. In any case, there should be at least 70 cm from the surface of the earth to the pipe. But if installation to the required depth is not possible, then you will have to make additional insulation and provide protection from mechanical damage.

When it is impossible to maintain the desired tilt

When installation is accompanied by difficulties and it is not possible to maintain the correct angle of inclination, take the following actions:

Calculations that are within the permissible deviations can be used when laying a sewer system. It is important to make additional tees at a certain distance. Cleaning will be carried out through them.

In difficult areas, make elevation changes. Organize them by installing additional wells. With their help, lay communications properly, observing fixed standards. The number of wells may vary. From one to several. Depending on difficult cases, the length of the sewer.

If it is impossible to maintain standard indicators and the operation of the system will not be ensured properly by gravity, then you need to install a fecal pump. The device is suitable both for a specific sewer branch and for the entire system as a whole.

When laying plastic pipes, owners will be sure that cleaning will occur much less frequently than in the case of a cast iron system. Plastic pipes have a smooth inner surface, which ensures rapid sliding of drains. Cast iron does not have a perfectly smooth surface. Due to the presence of small notches and particles, waste will stop and grow faster.

Important features of laying sewer pipes

  1. When installing a pipeline system in deep basements or in places with low relief, versions with an extremely low sewer installation depth are provided, in which the installation of a pumping station is provided. The depth of the pressure line must be calculated according to the requirements of regulatory documents.
  2. Practice has shown that in problem soils (water-saturated, compacted to strong and silty) communications should be laid to a depth of four meters, in dry soils the depth is determined from four to seven meters.
  3. Communications built with a depth of less than 0.7 meters must necessarily have a sewerage protection zone on the surface of the earth. The security zone is equipped with a system to protect against possible mechanical damage to the pipeline.
  4. When carrying out projects for laying sewer communications, it is mandatory to take into account the difference in terrain relief lines.

Preparing for work

For installation you will need:

  1. plastic pipes with a cross-section of 5, 10 centimeters;
  2. connecting elements;
  3. cuffs to seal joints;
  4. glue for plastic;
  5. cement mortar;
  6. roulette;
  7. saw;
  8. level;
  9. marker.

When reconstructing an old sewer system, you need to study the features and layout plan in advance. Draw up an installation diagram. This action does not need to be performed if a new sewer system is being installed.

  1. A drawing should be displayed on paper, with fixed wiring locations and a bathroom. It is necessary to mark the riser and determine the distance.
  2. Check that the drawn diagram matches the existing one.
  3. Carry out calculations. Calculate the amount of material needed.

Organization of slope in a private house

The volume of wastewater in a country house is significantly less than in an apartment building. Under these conditions, even with a minimum slope determined from a hydraulic calculation table or formula, the filling level will be insufficient for self-cleaning of the pipe.

It is impossible to reduce the slope even more, since the flow rate will become too slow. Sand with other solid inclusions will settle to the bottom, and the pipe will probably clog. In such a situation, the required angle of inclination of the pipeline is determined by a non-calculation method.

Non-calculation method for determining slope

According to regulatory documents, the non-calculation method is used in cases where, due to the small volume of wastewater, it is impossible to fulfill the condition for the relationship between the optimal and actual filling level.

The old version of SNiP 2.04.01-85 set out the following recommendations on slope for undesigned sections of gravity pipelines:

  • Pipe diameter 40 or 50 mm – 0.03
  • Pipe diameter 85 or 100 mm – 0.02

The updated version of this SNiP, set out in SP 30.13330.2016, suggests that the minimum slope value for non-calculated sections of the pipeline should be considered equal to 1/d, where d is the outer diameter of the pipe in mm.

Recommendations from specialists for laying a collector from an individual country house to a septic tank:

  • A medium-sized house with two bathrooms - 110 mm pipe with a slope of 0.02
  • House with three or more bathrooms - 160 mm pipe with a slope of 0.08

Compliance with the proposed parameters preserves the transporting capacity of the liquid flow in the pipeline.

Slope check

The best device for checking the angle of inclination is a level. The device measures the depth of the trench under the pipeline at control points, and the difference is compared with the required value. If there is a deviation from the calculated value, the trench depth is adjusted.

To check the slope without a level, use a simple method using available tools. Two pins are inserted into the bottom of the trench at both ends. The cable is pulled between the pins and the horizontal position is checked using a building level. If necessary, leveling is done.

Then, near both pins, measure the height from the bottom to the cable. After determining the magnitude of the difference, proceed in the same way as in the situation with a level.

In the figure below, the initial depth of the trench is 0.5 m. Based on the recommended slope of 0.02 for a 110 mm pipe, we obtain:

We add the calculated depth difference of 0.6 m to the initial depth of 0.5 m and obtain a trench depth at the end point of the pipeline of 1.1 m.

Solving the problem of a steep slope

If in the direction of laying communications the steepness of the slope exceeds the standard slope, then at some point the more gently located pipeline will come to the surface. The problem can be solved in two ways.

The first option is to make vertical decreasing sections in the pipeline as it approaches the surface. In the second option, a large vertical depression is immediately made, which is enough for the entire length of the collector.

Downgrade scheme according to the first and second options

Calculation of slope for an apartment

To install a sewer system for a sink, washbasin and bathroom, you need to choose pipes with a diameter of 40-50 mm. There should be a slope of no more and no less than 2.5-3.5 cm per meter. The minimum value of the slope coefficient per meter is 0.012, and the standard value is 0.02. For a toilet, the required slope is 85-100 mm, and for a common riser - 100 mm. To calculate the slope coefficient, the formula is used:

V*√(H/d)>K,

where K is the coefficient for plastic and glass pipes 0.5, and for others 0.6,

N is the coefficient of how quickly the pipeline fills,

V is the speed of fluid movement along the line,

D is the internal diameter of the pipe.

To correctly set the level of inclination of the pipe in the apartment, it is enough to use a regular ruler.

How to calculate occupancy levels

For plastic and cast iron pipes, it is mandatory to calculate the level of water filling. Thanks to this indicator, you can find out at what speed the water should move so that it cannot become clogged. And of course, the exact value of the slope per meter depends on this indicator. To calculate the filling rate, you need to divide the water level in the pipe by the diameter.

The minimum indicator according to SNIPA is 0.3, and the maximum is 1. But, in practice, this occupancy rate is in the range of 0.3-0.6. It is the optimal one.

Example of storm sewer calculation

Some designers do not go into the details of storm sewer calculations, using the recommended pipe diameters specified in SNiP. For non-pressure networks, a pipeline with a diameter of 200-250 mm is usually used as a drainage system. It is this size that guarantees the optimal speed of movement of surface runoff in the event of intense precipitation. At the same time, a correctly performed calculation contributes to more efficient management of the budget, since pipes of a smaller diameter may be suitable for the normal functionality of the storm network.

Calculation of pipe diameter allows you to reduce costs without compromising the functionality of the system

As an example, let’s calculate the parameters of a drainpipe for the roof of a private house with an area of ​​100 m² (0.01 ha), located in one of the settlements of the Moscow region:

  1. According to the rain intensity map, the q20 parameter for Moscow and surrounding areas is 80 l/s. The moisture absorption coefficient for the roof is 1. Based on these data, we calculate the flow of rainwater:

Qr =80·0.01 = 0.8 l/s

  1. Since the roof slope in a private house, as a rule, significantly exceeds 0.03 (3 cm per 1 m), the fill factor of the free tank during pressure mode is taken equal to 1. Thus:

Q = Qr = 0.8 l/s

  1. Knowing the rainwater flow rate, you can not only calculate the diameter of the storm drain, but also determine the required drainage slope. To do this, we will use the reference book by A.Ya. Dobromyslova “Tables for hydraulic calculations of pipelines made of polymeric materials. Non-pressure pipelines." According to the calculated data presented in the tables, for a flow rate of 0.8 l/s, pipes with the following parameters are suitable:
  • diameter 50 mm, slope 0.03;
  • diameter 63 mm, slope 0.02;
  • diameter 75 mm (and higher), slope 0.01.

The slope of the pipe is inversely proportional to its diameter

  1. Pipeline material.

SNiP allows the use of pipes made of asbestos cement, steel and plastic (PVC). An asbestos-cement pipeline, although an economical option, is used quite rarely today due to the fragility of the material and its heavy weight (1 meter of a 100 mm pipe weighs 24 kg). Steel pipes are much lighter than asbestos, however, they are prone to corrosion. Therefore, PVC pipes are most often used for storm drains, which combine light weight, ease of installation and long service life.

  1. The depth of the underground part.

The optimal location of the pipe is below the soil freezing level and above the groundwater level. Since not every location allows this condition to be met, it is permissible to lay the pipeline at a shallow depth, but no closer than 70 cm to the surface.

  1. Installation of risers.

Rainwater is drained from the roof by means of risers, under which point or linear rainwater inlets are placed. Vertical drainage systems are attached to the wall using clamps. The calculation of the fastening interval for storm sewer risers is carried out taking into account the pipe material. For PVC, clamps are placed at intervals of 2 m, for steel - 1-1.5 m.

  1. Secured territory.

SNiP provides for the organization of so-called security zones near the location of the stormwater network. At a distance of less than 3 m from the pipeline, it is prohibited to erect construction projects, plant bushes and trees, arrange a garbage dump, or arrange a parking space.

Typical storm drainage scheme for a private house

Designing a rainwater drainage system is an important stage in the construction of a residential building or industrial site. This article provides formulas for a rough calculation of the diameter of a pipeline, since they do not take into account parameters such as friction of water on the inner surface of the pipe, the number of bends and connections in the system, etc. For more accurate calculations of storm sewers, there are special programs that can be found on the Internet . However, the surest method is to entrust the design to specialists who will take into account all the nuances and offer the most effective and cost-effective option.

Errors during sewer installation

Although installing a sewer system does not seem to be a very difficult task, many users make the following mistakes when installing it:

  1. They violate the sewer slope for a private home, forgetting to check it, and an underestimated value leads to frequent blockages and freezing of water in the pipeline in winter. Too much slope causes liquid fractions to drain quickly, while solid waste remains in the pipes - this also increases the likelihood of blockages.
  2. They do not install a vent riser to remove gases (methane), as a result, foreign odors appear and the fire hazard in the house increases.
  3. Unjustifiably, wastewater is divided into gray water from the kitchen, bathroom, household appliances and sewage from the bathroom. As a result, some pipes remain clean all the time, while the other part is subject to too much contamination, which leads to incorrect operation of the sewer system.
  4. When calculating the permissible diameter of the pipeline, along with the total volume of wastewater, as a rule, one-time drainage from the simultaneous use of a bathtub, sink, toilet, shower, and household appliances is not taken into account.
  5. The use of bends with right angles during installation leads to a significant increase in hydraulic losses, slows down the flow of wastewater, and increases the likelihood of blockages.
  6. Insufficient deepening of the pipeline on the street or lack of insulation with an electric cable, a shell made of thermal insulation materials, leads to freezing of the underground line in winter and disruption of the entire system.
  7. The absence of a check valve on the way to the septic tank during blockages or emergency situations can cause reverse pressure flow of wastewater into residential premises.
  8. Installing plumbing equipment without siphons in the absence of water seals causes unpleasant odors to appear in the house.
  9. The use of PVC pipes in risers often leads to increased noise and, accordingly, a decrease in living comfort. To combat noise, special types of silent pipes are used or PVC pipelines are covered with noise-insulating materials.


Option for laying internal sewerage
When installing individual sewerage, one of the most important conditions is to accurately maintain standard slopes - this ensures correct and long-term trouble-free operation of the entire system. Knowing the correct angle of inclination of sewer pipes, it is easy to independently design the location of indoor plumbing fixtures and external treatment facilities in the form of septic tanks.

Construction of storm drainage

In general, installation work on the installation of storm drains is carried out in the same way as when laying external pipelines of a conventional sewer system.

Selection of pipes for the underground part of the pipeline

If external storm sewer networks are installed, SNiP allows the use of the following types of pipes:

  • Asbestos-cement;
  • Steel;
  • Plastic.

Asbestos cement is a traditional material used for the construction of external sewerage pipelines, including stormwater. The disadvantages of the material include its high fragility and significant weight (a meter of pipe with a diameter of 100 mm weighs more than 24 kg). Steel pipes have much less weight (a meter of pipe weighs about 10 kg), but they are prone to corrosion, so it is not profitable to use them for the construction of storm drains.

Recently, plastic pipes have been used to construct storm drains. They are light (a meter weighs no more than 5 kg), but durable and resistant to corrosion. In addition, they are easy to connect and do not require welding. Can be used:

  • PVC pipes, if external networks are installed, then for their construction you need to use a special type of pipes, they are painted orange;
  • Multilayer polymer pipes. Today this is the best option. These pipes have a smooth inner surface, so there is no hydraulic resistance.

Installation of the roofing part

The work goes like this:

  • Openings are made in the ceilings for installing rainwater inlets, and all junctions are carefully sealed.
  • Drainage pipes are strengthened when constructing a point system or trays when installing a linear storm drain.
  • Install drain risers or pipes.
  • A unit is assembled for discharging water into a collector or discharging into tray systems.
  • All devices are attached to walls and ceilings using clamps. Places for installing clamps are planned in advance, not forgetting to follow the recommended slope values.

Laying the underground part

  • Installation begins with the installation of trenches. When constructing systems such as storm sewers, the depth of installation is most often determined not by the depth of freezing, but by the experience of operating the systems at the construction site.
  • Trenches are dug with a slope, that is, their depth should gradually increase.
  • At the bottom of the trenches there is a sand cushion, the layer height is 20 cm.
  • A pit is being prepared for installing the collector.
  • Pipes should be laid in the prepared ditches, the pipes should be connected to each other and connected to the collector using conventional fittings.
  • If the sewer network consists of a single branch more than 10 meters long, then it is worth planning to install a manhole in the middle of it. Such wells should be installed at network branch points.
  • Sand traps are installed at the junction of water inlet gutters and stormwater pipe systems.
  • Now all that remains is to backfill the trenches and cover the open structures (trays) with gratings on top.

Collector installation rules

When arranging a network of pipes or storm drainage trays, you must follow some rules

  • Thus, the communication device requires not only laying a sand and gravel cushion in the trench, but also pouring concrete mortar to securely fix the collector.
  • When installed, the entire system must be equipped with special sand traps that will clean the water from small debris and prevent silting of the entire network. Such tanks are installed at the point where water enters from storm water inlets or gutters into a common sewer pipe.

Important: sand trap baskets require regular cleaning. If there is a tortuous communication line, it is worth placing inspection wells at all turns

By the way, they can also play the role of sand traps. If a straight network with a length of more than 10 meters is being constructed, then an inspection well is also installed on each 10 m segment.

If there is a tortuous communication line, it is worth placing inspection wells at all turns. By the way, they can also play the role of sand traps. If a straight network with a length of more than 10 meters is being constructed, then an inspection well is also installed on each 10 m segment.

https://youtube.com/watch?v=mYqthJUxyLc

Studying the standards

All construction and installation work must be carried out in accordance with current standards, rules and regulations. Such requirements are specified in GOSTs and SNiPs. The same applies to the installation of storm drains. SNiP 2.04.03-85 is in force here, which is called “Sewerage. External structures and networks."

Some paragraphs of this document indicate the recommended depth for laying stormwater pipes. According to them, installation should be carried out:

  • for pipes with a cross-section of up to 500 mm, at least 30 cm below the ground freezing level;
  • for pipes with a cross-section of more than 500 mm - at least 50 cm.

But all these points regarding the depth of occurrence are rather advisory in nature. Their use lies with the conscience of installers and builders. According to SNiP, installation must be carried out based on the experience of operating sewer systems in each specific region. In general, the minimum depth should be at least 70 cm from the surface.

How to choose

When choosing, you need to pay attention to their color. Elements intended for the sewer system are gray in color. Dimensions indicate that each type performs a specific function.

When reconstructing an old sewer system, you need to compare the dimensions of the old pipe with the new one. Then there will be no installation errors.

Consider household appliances. For normal drainage of liquid from a dishwasher or washing machine, it is enough to select a pipe with a diameter of 2.5 centimeters. For shower, bath – 3.5 centimeters. Pipes with a diameter of no more than 5 centimeters are laid throughout the house. The riser will require an element with a diameter of 11 centimeters.

In order not to spend extra money or make a mistake, you need to measure the old pipes. Based on the data, purchase a sufficient number of items. Connecting structures are purchased in the same quantity as the old sewer system.

Formulas for hydraulic calculation of storm networks

In order to calculate the diameter of a storm sewer pipe, it is necessary to determine the average flow of rainwater, which depends on the climatic conditions in a particular area.

The maximum flow rate (intensity) of rainwater is calculated using the formula:

Qr = q20·Ψ·F

Where:

q20 – estimated rain intensity for 20 minutes;

Ψ – coefficient of moisture absorption by a certain type of coating (roofing – 1.0; asphalt – 0.95; concrete – 0.85; crushed stone – 0.4);

F – surface area (in hectares) on which drainage is planned.

Rain intensity map for determining q20 coefficient

For the hydraulic calculation of the storm drainage network, it is necessary to make an adjustment for the filling factor of the free pipeline when a pressure regime occurs (β). Thus, the flow of rainwater is calculated as

Q = Qr·β

Coefficient β is determined from the table:

Rain duration indicator n0,70,60,50,4
β coefficient value0,650,70,750,8

In turn, the parameter n depends on the geographical location of the object:

AreaParameter value n
Coast of the Barents and White Seas0,4
North of the European part of the Russian Federation0,48
Center and west of the European part of the Russian Federation0,59
Western slope of the Urals0,59
Lower Don and Volga0,57
Lower Volga region0,66
Central Siberia0,47
Eastern Siberia0,52
Western Siberia0,58
Altai0,48
Coast of the Sea of ​​Okhotsk0,31

If the terrain slope is 1-3 cm per 1 m, then the β coefficient must be increased by 15%. For a larger slope, this parameter is taken equal to 1.

Execution of work

To dismantle the old sewer you need:

  1. identify difficult areas where additional work will be needed. For example, the place where the pipeline passes through the wall;
  2. Use a chisel to dismantle old pipes. Cast iron particles must not be allowed to enter the main line;
  3. If you don’t need to change the main riser, then saw off the pipe using a grinder.
  4. After dismantling, work stops until the connecting parts cool completely.

As for installing a plastic pipeline, there are two ways. The first is based on installation using glue:

  1. cut pipes to the required lengths;
  2. clean the edges with sandpaper and degrease;
  3. apply glue in necessary places;
  4. connect;
  5. leave until completely dry - 1 hour.

Second way:

  1. cut pipes, clean them;
  2. heat the soldering device to 260 degrees;
  3. fix the connector and pipe on the soldering iron;
  4. connect in heated places;
  5. check the seams.

Calculation of pipe filling degree

What pipe diameter should I choose for laying external sewerage? This question should stand alongside other factors when creating a project. Because the rate of water drainage depends on this. The water filling coefficient is measured in centimeters per meter; the degree calculation cannot be used here due to the fact that errors will arise, for example: the length of the pipeline is too large and ultimately even a small discrepancy will lead to the fact that the elements will not converge and will be located in different planes .

The value that will be optimal for the operation of the sewerage system is calculated by the formula, it sounds like this: we divide the sewerage rise level “H” by the diameter of our sewer pipe “D”. The value we should get should vary between 0.5 and 0.6. If we get 0 during the calculation, this will mean that the pipe will be constantly empty. If we have the final number 1, then the pipe will be constantly and completely flooded with water. Which will have a detrimental effect on the system. The formula itself looks like this

Y=H/D

  • H – height;
  • D – diameter;
  • Y – filling values.

If you use PVC pipes, then its filling should be 0.5. The reason for this is its inner surface; it has no roughness. Unlike asbestos or iron pipes, they have the highest degree of roughness, for this value it is 0.6.

The value described above will allow wastewater to pass at an average speed of 0.7 m/s. This will keep solids suspended, preventing them from sticking to the walls of the sewer pipes.

Why is slope needed and what does it depend on?

Unlike a plumbing system, sewage drainage through pipes is carried out due to natural gravity without pressure, so a slope is necessary for transporting it to the collection point.

The standards regulate the minimum slope values, established experimentally, taking into account various factors, so violation of the parameters in the direction of decrease will lead to incorrect operation and frequent blockages in the sewer system.

The angle of inclination of the sewer pipe depends on the following factors:

  • Pipeline diameter: as it increases, the slope becomes smaller.
  • Pipe material: when laying pipelines with a rough shell, due to high hydraulic resistance, the slope is made higher. Polyvinyl chloride (PVC) pipes used in the installation of individual household sewerage systems are considered hydraulically smooth; a concrete pipeline has the highest roughness.
  • Sewer system designs: in a main line that has a large number of bends and turns, the hydraulic resistance is higher than that of a straight line; therefore, when laying it, a greater degree of slope is required.


Roughness of various pipes

Rainwater drainage via other networks

Private real estate projects traditionally include other communication networks along with storm drainage. Domestic sewerage and drainage systems are also part of household communications. The principle of their operation differs little from the functioning of storm drains, in which owners of private houses often see the possibility of using these networks.

Meanwhile, the combination of storm sewerage with a domestic or drainage drainage scheme is prohibited by SNiP. The ban on combining different types of sewage systems is due to obvious factors. Thus, provided that rainwater is discharged into the domestic sewer system and taking into account the high intensity of precipitation, the normal level of sewerage is increased several times.

Flooding of working wells leads to blockage of household and fecal wastewater. Mud deposits and natural debris flow into the domestic sewage system. As a result, after the next rainstorm, the organizers of the structure will have to clean the system.

Combining a stormwater system with a drainage main threatens to result in even more disastrous results. Overflow of drainage due to violation of design loads leads to flooding of the building foundation. Frequent flooding disrupts the structure of the soil, which causes displacement of foundation blocks, and in the future can lead to the destruction of the building.

Professional design

Not everyone can carry out an independent storm drain calculation.
In addition, if the owner of a private residential plot has the right to make a mistake, he can design a sewer system at his own peril and risk

To organize even a small enterprise, to draw up plans for the improvement of urban or courtyard areas, carefully calculated, technically sound projects are required that fully comply with all existing sanitary and construction standards.

Such design and survey work is carried out by special organizations that have state certification to carry out activities of this kind

.

When contacting specialists, the customer presents them with a number of documents that will form the basis of the technical specifications:

  • Topographical diagram of the territory from which stormwater is expected to be drained.
  • Geological survey data containing information about the nature of the soils on the site.
  • General development plan.
  • If you plan to discharge into a centralized collector system
    , the technical conditions of the water utility services for connection.
  • Sanitary standards for water purification if it is intended to be discharged into natural reservoirs or drainage fields.
  • Possible customer wishes for organizing the accumulation of collected water.

The result of the designers’ work is a package of documents, which includes:

  • General information about the site being developed and storm drainage.
  • Detailed schematic diagram of storm drainage.
  • A scaled drawing-plan of the site with reference to the locations of all elements of the storm drain. In essence, it is a ready-made installation instruction for further work.
  • Detailed specification of the equipment required according to the technical specifications.
  • A full estimate for the purchase of the required materials and construction, installation and commissioning works.

The finished storm sewer project is subject to mandatory approval from water utility companies, state technical supervision authorities, the sanitary-epidemiological service, and the environmental control service in charge of the state of water resources.

Only after the project has been fully approved by all regulatory authorities can its practical implementation begin.

Some design organizations take on the entire process of approving the project they have developed.

The design process is complex, but there are no trifles in this matter.

In order for the storm sewer to fully fulfill its functions, so as not to incur penalties for violations of environmental legislation, it is better to entrust the development of the project to experienced specialists whose qualifications are not in doubt.

Individual slope calculation

Laying sewer pipes with your own hands in a private house is carried out according to the standards that appear in SNiP. But you can calculate the parameters for the arrangement of sewerage and water supply networks yourself. To do this, use the following formula:

V√H/D ≥ K, where:

  • K is a special coefficient that takes into account the properties of the material that was used in the manufacture of the pipe;
  • V – speed of passage of wastewater;
  • H – pipe filling capacity (flow height);
  • D – section (diameter) of the pipe.

The slope of sewer pipes can be calculated independently

Explanations:

  • coefficient K, for pipes made of smooth materials (polymer or glass), should be equal to 0.5, for a metal pipeline - 0.6;
  • indicator V (flow velocity) - for any pipeline is 0.7-1.0 m/s;
  • H/D ratio - indicates the filling of the pipe, and should have a value from 0.3 to 0.6.

Internal and external sewer systems

When laying sewer and water supply networks in a private house, you should take into account some features that are determined by the location of their individual sections.

Internal systems

When installing sewer pipes in a private house, two diameters are mainly used - 50 mm and 110 mm. The first is for drainage, the second is for the toilet. The laying of the sewer pipe should be carried out in accordance with the following recommendations:

  • turning the pipeline (if it is horizontal) should not be done at an angle of 90 degrees. To change the direction, it is better to install the bends at an angle of 45 degrees, this greatly facilitates the passage of the main flow and reduces the likelihood of accumulation of solid particles;
  • in places where the system turns, fittings should be installed for inspection and ease of cleaning or dismantling in case of clogging;
  • in short individual sections, it is permissible to increase the slope, exceeding the recommended norm. Such a short sewer branch can be a pipe connecting the toilet to the riser;
  • in each individual section, the slope of the pipeline must be uniform, without sudden changes, because their presence can create conditions for the occurrence of a water hammer, the consequences of which will be the repair or dismantling of an already operating system.

External (external) systems

Proper laying and installation of sewer pipes is necessary not only inside, but also outside a private home, from the point of exit of the internal sewerage system to the septic tank.

Therefore, you should pay attention to the following points:

  • laying of sewer networks is carried out in trenches with a depth of 0.5 to 0.7 meters. The depth of penetration depends on the characteristics of the soil and is adjusted to specific conditions;
  • when preparing trenches, sand should be used at the bottom to be able to establish the correct slope by adding it;
  • highlight the pre-calculated slope (per linear meter) as a guide from the cord stretched between the driven pegs. This will avoid unnecessary subsidence or elevation of the sewer system in certain areas;
  • After laying the pipes at the bottom of the trench, check again for the correct slope and, if necessary, correct it using a sand cushion.

What should you follow when determining the slope?

If we take into account all the SNiP rules for organizing the inclination of sewer pipes, the general list will look like this:

  1. The maximum possible slope is 15 cm.
  2. When installing an external sewerage system, it is necessary to take into account the factor of soil freezing depth.
  3. When determining the slope of structures, it is recommended to seek the help of specialists and additionally check the calculations using regulatory literature. (possibly on your own)
  4. When installing a sewer system in a bathroom, you can resort to a minimum slope, since there is no risk of clogging the pipe with large particles.
  5. You can determine the slope using a bubble level. It needs to be laid in the place where the pipe is located, and depending on the position of the bubble, calculate the amount of inclination.

Also, before carrying out work, it is necessary to draw up a plan for the sequence of actions to avoid possible mistakes. The sewerage profile is also applied to the plan, and this item is prescribed by GOST 21.604-82.

If you take into account all the requirements of the documents, you will be able to organize a sewer system and ensure a normal slope with your own hands.

Additional recommendations

Some additional tips for calculating and installing external and internal sewerage:

  • When installing a sewer system indoors, it is worth taking into account the shrinkage of drain pipes that often appears under operating conditions. To avoid any malfunctions in the sewer system, it is necessary to periodically adjust the inclination level.
  • If possible, connect sewer pipes to each other at an angle of at least 120 degrees; if for some reason this cannot be done, then you will have to add another inspection hatch to control the system and clean it in a timely manner.
  • when installing hidden sewerage in the floor and walls of the bathroom and kitchen, check the tightness of the connection and add inspection hatches every 30-40 centimeters.
  • installation of external sewerage should be carried out in the opposite direction of flow, that is, from the drain well to the living space.

Types of sewer systems

There are two types of sewer systems based on the method of moving wastewater - gravity and pressure.

Gravity sewerage uses the principle of moving wastewater in the direction of discharge under the influence of its own mass. The movement is provoked by the inclined location of the pipeline. This is the most common type of sewer system.


Scheme of gravity sewerage using a septic tank

Pressure sewerage moves wastewater forcibly using a pump. The fecal pump raises the waste mass to the desired height. Pressure sewerage is used in cases where it is impossible to position the pipeline at the required slope, and accordingly, gravity discharge is impossible.


Scheme of drainage of a residential building using pressure sewerage

Reasons for replacing a gravity sewer with a pressure one:

  • The collector pipe is located below the level of the centralized sewer network. A similar situation arises when the building is located in a low-lying area or there are waste disposal points in the basement, for example a swimming pool or sauna.
  • The house was built on a site with uneven terrain (hills, folds of terrain). The connection to the terrain makes it impossible to lay the pipeline at the required slope.
  • According to technical conditions, it is necessary to use pipes of a smaller diameter than required in accordance with the calculations. In this case, when discharged by gravity, water takes a long time to pass through and the sewer becomes clogged.
  • The characteristics of the soil do not allow digging a trench of the required depth for the collector.

The cost of equipment and operating costs of pressure sewerage are higher compared to gravity sewerage. For the system to function properly, electricity and high-strength pipes are required. For this reason, gravity sewerage is preferred if conditions exist for its installation.

Premises that require a separate determination of the required slope

The kitchen, bathroom and toilet are those rooms in which the angle of inclination is calculated separately, due to the plumbing installed there. The sink in the kitchen, as well as the washbasin in the bathroom, are calculated based on the fact that the pipes for them always use 4 or 5 cm, for them the minimum slope should be 25 mm, and the optimal 35 mm. For a toilet, a sewer pipe with a diameter of 10 cm is usually installed; the angle of inclination for it should accordingly be 12 mm minimum, and ideally 20 mm.

DeviceSlopeDistance between drain and siphon, cmPipe diameter, mm
Bath1:30100-13040
Shower1:48150-17040
Toilet1:20up to 600100
Sink1:120-8040
Bidet1:2070-10030-40
Washing1:36130-15030-40
Combined drain (sink, bath, shower)1:48170-23050

Maintaining the angle

The angle of inclination is half of the work. The main part is due to the maintenance of this indicator during the installation of the sewer system. Craftsmen use a special protractor.

If the protractor does not work, there is no way to get one; specialists make do with a simple level. There are a couple of methods:

  1. Draw a line on the wall corresponding to the degree of slope. Attach a building level and make marks in the area of ​​the bubble. The pipe is installed relative to the position of the mark. The method is not ideal, as it allows for errors;
  2. attach a special pad to the meter level. The last element will correspond to the angle of inclination.

Details of the future bear

Next, think about how you will make the bear’s face. The easiest way is to buy a ready-made plastic nose and eyes and glue them on or draw on the eyes, nose and mouth with fabric markers. You can embroider a nose with thread, but for the most beautiful interior bears, you should look for glass eyes that are sewn on by hand in craft stores. Also, such bears, as well as real Teddy bears, will require special articulated mounts that allow the head and paws to move.

And the last thing - decorative elements. You can do without them, but the bear will be much cuter if you add some simple clothes or a ribbon around your neck.

Rating
( 1 rating, average 5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]